
Project
Location
117 Cherni Vrah Blvd, Sofia
Year
—
Status
Completed
The entrance foyer of RUhouse II on Cherni Vrah Boulevard.
Three materials do the work: gabion cages filled with stone, preserved moss planting, and oak battens set on the diagonal. A single line of light is cut through the batten wall and folded at the corner. The RUh mark is set into the concrete beside the lift.
Gallery